Solar & Battery Grid Connection in Sydney

Level 2 ASP grid connection of solar PV and battery systems — meter reconfiguration and network approval for export.

What is solar & battery grid connection?

Connecting a solar PV or battery system to the grid involves more than mounting panels. The point where your system feeds back into the network — and the metering and supply changes that go with it — is Level 2 ASP work. Castellano Electrical provides the network-side connection for solar and battery installations: reconfiguring or upgrading metering for bi-directional (export) measurement, upgrading the supply where the system requires it, and lodging the connection and export approval with Ausgrid or Endeavour Energy.

Many solar jobs stall at the grid-connection stage. A larger inverter may exceed your single-phase export limit and require a three-phase upgrade; an old meter may not support export and need replacing; or the switchboard may need work before the system can be safely connected and energised. We assess these requirements up front so your installer’s timeline isn’t derailed, and we handle the distributor application for connection and export so your system can legally feed back into the grid.

For battery and hybrid systems the requirements can be more involved again, particularly where backup supply and load shedding are part of the design. We make sure the metering, supply capacity and network approval all line up with the system being installed, complete the ASP connection work to standard, and certify it. Whether you are adding a modest rooftop array or a large solar-and-battery setup, we deliver the network connection that lets it run — and export — compliantly.

Why only a Level 2 ASP can do this work

Solar & Battery Grid Connection is work on the network side of your electricity supply — the connection between the distributor's network and your meter. A standard electrician is licensed for the wiring inside your property, but only a Level 2 Authorised Service Provider (ASP) is authorised to connect, disconnect or alter that supply. If this work is done by a non-ASP, the distributor will not energise it and it has to be redone.

Castellano Electrical holds Level 2 ASP authorisation for both Ausgrid and Endeavour Energy, so we can carry out solar & battery grid connection anywhere in Greater Sydney and manage the distributor process for you. You can read more about electrical licensing in NSW via NSW Fair Trading.

The process, step by step

  1. Review the system. We review the inverter, battery and export requirements against your existing supply.
  2. Identify upgrades. We confirm any metering, supply or switchboard upgrades needed for connection.
  3. Network approval. We lodge the connection and export approval with Ausgrid or Endeavour Energy.
  4. Connect & meter. We complete the ASP connection and arrange the export-capable meter.
  5. Energise & certify. We energise the connection and issue compliance documentation.

Key benefits

  • Bi-directional (export) metering reconfiguration or upgrade
  • Supply upgrades where larger inverters require them
  • Network connection and export approval lodged with the distributor
  • Switchboard work to safely connect solar and battery
  • Keeps your solar installer’s timeline on track

Distributor coverage & service areas

We provide solar & battery grid connection across both Sydney network areas. Your property's distributor determines the application process and standards, and we are authorised for both:

  • Ausgrid: Ausgrid operates the electricity network across the Sydney CBD, eastern suburbs, inner west, lower and upper north shore, northern beaches, the Central Coast and the Hunter.
  • Endeavour Energy: Endeavour Energy operates the network across Greater Western Sydney, the South West, the Blue Mountains, the Southern Highlands and the Illawarra.

Not sure which network covers you? Our Ausgrid vs Endeavour Energy service areas guide breaks it down suburb by suburb, or see all the Sydney areas we cover.

What does it cost?

Solar connection cost depends on whether metering or supply upgrades are required. Often quoted with your solar installer.

Solar & Battery Grid Connection: your questions answered

Why does solar need a Level 2 ASP?

The point where your system exports back into the network, and the metering and supply changes that go with it, are network-side work. Reconfiguring the meter for export and any supply upgrade must be done by a Level 2 ASP.

My solar installer fitted the panels — what do you do?

We complete the grid-connection side: reconfiguring or upgrading the metering for bi-directional (export) measurement, any supply upgrade the system needs, and lodging the connection and export approval with the distributor.

Why has my solar connection stalled?

Common reasons are that the inverter exceeds the single-phase export limit and needs a three-phase upgrade, the existing meter does not support export, or the switchboard needs work. We resolve these so the system can be energised.

Do I need three phase for my solar system?

Larger inverters and systems often require three-phase supply to meet export limits. We assess the system against your existing supply and advise whether an upgrade is needed.

Do you handle the network export approval?

Yes. We lodge the connection and export approval with Ausgrid or Endeavour Energy so your system can legally feed power back into the grid.

Can you connect a battery as well as solar?

Yes. Battery and hybrid systems can have more involved requirements, especially with backup supply. We make sure the metering, supply and network approval all suit the system being installed.

Will I need a new meter for solar?

If your existing meter does not support bi-directional measurement, an export-capable meter is required. We coordinate this with the metering provider as part of the connection.

How much does the grid connection cost?

It depends on whether metering or supply upgrades are required. Where the existing supply is adequate the connection is straightforward; an upgrade adds cost. We quote after reviewing the system.

Get a free quote for solar & battery grid connection

Tell us about your job and we’ll confirm your network distributor, scope the work and get back to you with a quote — usually within one business day. For urgent connections or disconnections, call our 24/7 line.

Ausgrid Authorised Endeavour Energy Authorised
Level 2 ASP
ASP 24187
Electrical contractor licence
248317C
Public liability
$20 million
Professional indemnity
$1 million
Workmanship warranty
12 months on all workmanship
Established
2009

No obligation. We typically reply within one business day.

Need a Level 2 ASP electrician in Sydney?

Authorised for Ausgrid and Endeavour Energy. Free quotes for planned work, 24/7 response for emergencies.

Prefer to talk? Office line (02) 8503 7421 · Mon–Fri: 7:00am – 5:00pm

Emergency Call24/7 Emergency · 0488 271 904Book a Quote